{"id":119,"date":"2010-12-15T00:14:29","date_gmt":"2010-12-15T00:14:29","guid":{"rendered":"http:\/\/03278ba.netsolhost.com\/main\/?p=119"},"modified":"2011-05-09T04:14:40","modified_gmt":"2011-05-09T04:14:40","slug":"dwinelle-hall-expansion-university-of-california","status":"publish","type":"post","link":"https:\/\/arntzbuilders.com\/?p=119","title":{"rendered":"Dwinelle Hall Expansion, University of California"},"content":{"rendered":"<h2><strong>Location: <img decoding=\"async\" class=\"lazyload alignright size-medium wp-image-471\" title=\"UCB-Dwinelle005\" src=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%27300%27%20height%3D%27200%27%20viewBox%3D%270%200%20300%20200%27%3E%3Crect%20width%3D%27300%27%20height%3D%27200%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" data-orig-src=\"\/wp-content\/uploads\/2010\/12\/UCB-Dwinelle005-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" \/><\/strong><\/h2>\n<p><strong><\/strong>Berkeley, CA<\/p>\n<h2><strong>Owner:<\/strong><\/h2>\n<p>University of California at Berkeley Facilities Department<\/p>\n<h2><strong>Architect: <\/strong><\/h2>\n<p><strong><\/strong>Simon Martin-Vegue Winkelstein Moris<\/p>\n<h2><strong>Scope of Work:<\/strong><\/h2>\n<p>We added two floors to the existing, occupied, five (5) story office and  classroom building during the winter months.  Approximately 32,000 SF  of new construction and 150,000 SF of renovation work.  The south wing  attic was converted into a computer facility and the two new floors  added to the north wing house faculty and department offices.  New  computer communications were installed as well as new sprinkler and fire  alarm systems.  The construction was very difficult because the  building remained occupied and operation throughout the construction.<\/p>\n\n","protected":false},"excerpt":{"rendered":"<p>We added two floors to the existing, occupied, five (5) story office and classroom building during the winter months. Approximately 32,000 SF of new construction and 150,000 SF of renovation work.<\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7],"tags":[],"class_list":["post-119","post","type-post","status-publish","format-standard","hentry","category-higher-education"],"_links":{"self":[{"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=\/wp\/v2\/posts\/119","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=119"}],"version-history":[{"count":0,"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=\/wp\/v2\/posts\/119\/revisions"}],"wp:attachment":[{"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=119"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=119"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=119"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}