{"id":148,"date":"2010-12-15T00:24:57","date_gmt":"2010-12-15T00:24:57","guid":{"rendered":"http:\/\/03278ba.netsolhost.com\/main\/?p=148"},"modified":"2011-05-09T03:07:17","modified_gmt":"2011-05-09T03:07:17","slug":"foothill-middle-school-el-dorado-middle-school-and-holbrook-elementary-school-modernizations","status":"publish","type":"post","link":"https:\/\/arntzbuilders.com\/?p=148","title":{"rendered":"Foothill Middle School, El Dorado Middle School and Holbrook Elementary School Modernizations"},"content":{"rendered":"<h2><strong>Location: <img decoding=\"async\" class=\"lazyload alignright size-medium wp-image-538\" title=\"FoothillMS006\" src=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%27300%27%20height%3D%27200%27%20viewBox%3D%270%200%20300%20200%27%3E%3Crect%20width%3D%27300%27%20height%3D%27200%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" data-orig-src=\"\/wp-content\/uploads\/2010\/12\/FoothillMS006-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" \/><\/strong><\/h2>\n<p><strong> <\/strong>Concord and Walnut Creek, CA<\/p>\n<h2><strong>Owner:<\/strong><\/h2>\n<p>Mt. Diablo Unified School District<\/p>\n<h2><strong>Architect:<\/strong><\/h2>\n<p>ATI Architects, Corlett, Skaer and DeVoto Architects<\/p>\n<h2><strong>Scope of Work: <\/strong><\/h2>\n<p><strong><\/strong>Over three summers we built sixty three (63) single classroom units at  fourteen school sites for the Mt. Diablo Unified School District.  The  work at these sites also included modernization including painting, new  roofs and campus wide fire alarm and communication systems. Much of the  modernization work had to be done with students present which required  much coordination.<\/p>\n\n","protected":false},"excerpt":{"rendered":"<p>Over three summers we built sixty three (63) single classroom units at fourteen school sites for the Mt. Diablo Unified School District. The work at these sites also included modernization including painting, new roofs and campus wide fire alarm and communication systems. <\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[9],"tags":[],"class_list":["post-148","post","type-post","status-publish","format-standard","hentry","category-schools-k-12"],"_links":{"self":[{"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=\/wp\/v2\/posts\/148","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=148"}],"version-history":[{"count":0,"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=\/wp\/v2\/posts\/148\/revisions"}],"wp:attachment":[{"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=148"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=148"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=148"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}