{"id":2401,"date":"2015-02-14T00:14:54","date_gmt":"2015-02-14T00:14:54","guid":{"rendered":"https:\/\/arntzbuilders.com\/?p=2401"},"modified":"2023-07-07T00:17:46","modified_gmt":"2023-07-07T00:17:46","slug":"miraloma-elementary-school-modernization","status":"publish","type":"post","link":"https:\/\/arntzbuilders.com\/?p=2401","title":{"rendered":"Miraloma Elementary School Modernization"},"content":{"rendered":"<h2>Jobsite Address:<img decoding=\"async\" class=\"lazyload   alignright wp-image-2541\" src=\"https:\/\/arntzbuilders.com\/wp-content\/uploads\/2015\/02\/DSCN0667-300x225.jpg\" data-orig-src=\"https:\/\/arntzbuilders.com\/wp-content\/uploads\/2015\/02\/DSCN0667-300x225.jpg\" alt=\"DSCN0667\" width=\"357\" height=\"268\" srcset=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%27357%27%20height%3D%27268%27%20viewBox%3D%270%200%20357%20268%27%3E%3Crect%20width%3D%27357%27%20height%3D%27268%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" data-srcset=\"https:\/\/arntzbuilders.com\/wp-content\/uploads\/2015\/02\/DSCN0667-300x225.jpg 300w, https:\/\/arntzbuilders.com\/wp-content\/uploads\/2015\/02\/DSCN0667-1024x768.jpg 1024w\" data-sizes=\"auto\" data-orig-sizes=\"(max-width: 357px) 100vw, 357px\" \/><\/h2>\r\n<p>175 Omar Way, San Francisco, CA 94127<\/p>\r\n<h2>Client:<\/h2>\r\n<p>San Francisco Unified School District<\/p>\r\n<h2>Architect:<\/h2>\r\n<p>Plum Architect<\/p>\r\n<h2>Contract:<\/h2>\r\n<p>$8 Million<\/p>\r\n<h2>Scope:<\/h2>\r\n<p>General School Modernization and reconstruction including ADA Access and Fire\/Life-Safety\u00a0upgrades, including but not limited to A.C. paving, striping and site furnishings, new play\u00a0structure, hazmat, roofing replacement and repairs, casework alterations, flooring, interior\u00a0painting, sink replacements, renovations of restrooms with new fixtures and finishes, accessible\u00a0drinking fountains, accessible signage, voluntary seismic upgrade including a seismic\u00a0separation, replacement boilers and water heater, new HVAC controls, upgrade to security\u00a0system, new P.A. system and telephone system, new lighting and lighting controls.<\/p>\r\n\r\n<h2 class=\"wp-block-heading\" id=\"project-completion\">Project Completion:<\/h2>\r\n\r\n\r\n\r\n<p>September 2015<\/p>\r\n","protected":false},"excerpt":{"rendered":"<p>Jobsite Address: 175 Omar Way, San Francisco, CA 94127 Client: San Francisco Unified School District Architect: Plum Architect Contract: $8 Million Scope: General School Modernization and reconstruction including ADA Access and Fire\/Life-Safety\u00a0upgrades, including but not limited to A.C. paving, striping and site furnishings, new play\u00a0structure, hazmat, roofing replacement and repairs, casework alterations, flooring, interior\u00a0painting, sink replacements, renovations of restrooms with new fixtures and finishes, accessible\u00a0drinking fountains, accessible signage, voluntary seismic upgrade including a seismic\u00a0separation, replacement boilers and water heater, new [&#8230;]<\/p>\n","protected":false},"author":8,"featured_media":2541,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[9],"tags":[],"class_list":["post-2401","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-schools-k-12"],"_links":{"self":[{"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=\/wp\/v2\/posts\/2401","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2401"}],"version-history":[{"count":10,"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=\/wp\/v2\/posts\/2401\/revisions"}],"predecessor-version":[{"id":4428,"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=\/wp\/v2\/posts\/2401\/revisions\/4428"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=\/wp\/v2\/media\/2541"}],"wp:attachment":[{"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2401"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2401"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2401"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}