{"id":2417,"date":"2015-02-14T00:11:04","date_gmt":"2015-02-14T00:11:04","guid":{"rendered":"https:\/\/arntzbuilders.com\/?p=2417"},"modified":"2023-07-07T00:18:48","modified_gmt":"2023-07-07T00:18:48","slug":"sota-aas-high-school-modernization","status":"publish","type":"post","link":"https:\/\/arntzbuilders.com\/?p=2417","title":{"rendered":"SOTA-AAS High School Modernization"},"content":{"rendered":"<h2><a href=\"https:\/\/arntzbuilders.com\/wp-content\/uploads\/2015\/02\/GNU_SOTa_02.jpg\"><img decoding=\"async\" class=\"lazyload alignleft wp-image-3163\" src=\"https:\/\/arntzbuilders.com\/wp-content\/uploads\/2015\/02\/GNU_SOTa_02.jpg\" data-orig-src=\"https:\/\/arntzbuilders.com\/wp-content\/uploads\/2015\/02\/GNU_SOTa_02.jpg\" alt=\"GNU_SOTa_02\" width=\"547\" height=\"365\" srcset=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%27547%27%20height%3D%27365%27%20viewBox%3D%270%200%20547%20365%27%3E%3Crect%20width%3D%27547%27%20height%3D%27365%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" data-srcset=\"https:\/\/arntzbuilders.com\/wp-content\/uploads\/2015\/02\/GNU_SOTa_02-300x200.jpg 300w, https:\/\/arntzbuilders.com\/wp-content\/uploads\/2015\/02\/GNU_SOTa_02.jpg 940w\" data-sizes=\"auto\" data-orig-sizes=\"(max-width: 547px) 100vw, 547px\" \/><\/a><\/h2>\r\n<h2>\u00a0<\/h2>\r\n<h2>\u00a0<\/h2>\r\n<h2>\u00a0<\/h2>\r\n<h2>\u00a0<\/h2>\r\n<h2>\u00a0<\/h2>\r\n<h2>\u00a0<\/h2>\r\n<h2>\u00a0<\/h2>\r\n<h2>\u00a0<\/h2>\r\n<h2>Jobsite Address:<\/h2>\r\n<p>555 Portola Drive, San Francisco, CA 94131<\/p>\r\n<h2>Client:<\/h2>\r\n<p>San Francisco Unified School District<\/p>\r\n<h2>Architect:<\/h2>\r\n<p>Deems Lewis McKinley Architecture<\/p>\r\n<h2>Contract:<\/h2>\r\n<p>$31.8 Million<\/p>\r\n<h2>Scope:<\/h2>\r\n<p>Phased modernization of the existing School of the Arts &amp; Academy of Arts and Science will consist of tenant improvements including, Hollow Metal Wall Framing, New Sound Resistant Music facilities, Handicap Ramps for site accessibility, \u00a0New Fire Alarm and Fire Life Safety System. The project will span a two year duration phasing around the schools schedules.<\/p>\r\n\r\n<h2 class=\"wp-block-heading\" id=\"project-completion\">Project Completion:<\/h2>\r\n\r\n\r\n\r\n<p>January 2017<\/p>\r\n","protected":false},"excerpt":{"rendered":"<p>\u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 Jobsite Address: 555 Portola Drive, San Francisco, CA 94131 Client: San Francisco Unified School District Architect: Deems Lewis McKinley Architecture Contract: $31.8 Million Scope: Phased modernization of the existing School of the Arts &amp; Academy of Arts and Science will consist of tenant improvements including, Hollow Metal Wall Framing, New Sound Resistant Music facilities, Handicap Ramps for site accessibility, \u00a0New Fire Alarm and Fire Life Safety System. The project will span a [&#8230;]<\/p>\n","protected":false},"author":8,"featured_media":3163,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[9],"tags":[],"class_list":["post-2417","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-schools-k-12"],"_links":{"self":[{"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=\/wp\/v2\/posts\/2417","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2417"}],"version-history":[{"count":13,"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=\/wp\/v2\/posts\/2417\/revisions"}],"predecessor-version":[{"id":4429,"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=\/wp\/v2\/posts\/2417\/revisions\/4429"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=\/wp\/v2\/media\/3163"}],"wp:attachment":[{"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2417"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2417"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2417"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}