{"id":2602,"date":"2015-04-28T16:54:24","date_gmt":"2015-04-28T16:54:24","guid":{"rendered":"https:\/\/arntzbuilders.com\/?p=2602"},"modified":"2017-09-18T22:57:32","modified_gmt":"2017-09-18T22:57:32","slug":"liberty-elementary-school","status":"publish","type":"post","link":"https:\/\/arntzbuilders.com\/?p=2602","title":{"rendered":"Liberty Elementary School"},"content":{"rendered":"<h2><a href=\"https:\/\/arntzbuilders.com\/wp-content\/uploads\/2015\/04\/Dan_Hardin_Architect-046.jpg\"><img decoding=\"async\" class=\"lazyload alignright  wp-image-2603\" src=\"https:\/\/arntzbuilders.com\/wp-content\/uploads\/2015\/04\/Dan_Hardin_Architect-046.jpg\" data-orig-src=\"https:\/\/arntzbuilders.com\/wp-content\/uploads\/2015\/04\/Dan_Hardin_Architect-046.jpg\" alt=\"Dan_Hardin_Architect-046\" width=\"398\" height=\"266\" srcset=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%27398%27%20height%3D%27266%27%20viewBox%3D%270%200%20398%20266%27%3E%3Crect%20width%3D%27398%27%20height%3D%27266%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" data-srcset=\"https:\/\/arntzbuilders.com\/wp-content\/uploads\/2015\/04\/Dan_Hardin_Architect-046-300x200.jpg 300w, https:\/\/arntzbuilders.com\/wp-content\/uploads\/2015\/04\/Dan_Hardin_Architect-046-1024x683.jpg 1024w, https:\/\/arntzbuilders.com\/wp-content\/uploads\/2015\/04\/Dan_Hardin_Architect-046.jpg 2592w\" data-sizes=\"auto\" data-orig-sizes=\"(max-width: 398px) 100vw, 398px\" \/><\/a><\/h2>\n<h2><\/h2>\n<h2><\/h2>\n<h2><strong>Jobsite Address:<\/strong><\/h2>\n<p>170 Liberty School Road<strong><br \/>\n<\/strong><\/p>\n<p>Petaluma, CA 94952<\/p>\n<h2><strong>Client:<\/strong><\/h2>\n<p>Liberty Elementary<\/p>\n<p>School District<\/p>\n<h2><strong>Architect:<\/strong><\/h2>\n<p>Dan Hardin Architect<\/p>\n<h2>Contract:<\/h2>\n<p>$4.1 Million<\/p>\n<h2><strong>Scope Of Work:<\/strong><\/h2>\n<p>The project included the modernization of +\/- 4,500 sf of existing classroom space, construction of over 9,000 sf of new classroom space and administration offices in three separate buildings and an interconnecting covered walkway.\u00a0 All new buildings were single story, slab on grade, wood framed construction.\u00a0 Site improvements included demolition\/removal of four portable classrooms, grading, relocation of a PG&amp;E gas main and power pole, site utilities (including septic), Colored Site Concrete, Large Concrete Retaining Walls, AC Paving, Slurry Seal Coating, Striping, Chain Link and Ornamental Fencing.\u00a0 The entire project was completed in 263 days on a fully occupied campus.\u00a0 Liberty School was thrilled with the project and Arntz Builders, Inc. was recognized with an award at the ribbon cutting ceremony.<\/p>\n<p>&nbsp;<\/p>\n\n\t\t<style type=\"text\/css\">\n\t\t\t#gallery-1 {\n\t\t\t\tmargin: auto;\n\t\t\t}\n\t\t\t#gallery-1 .gallery-item {\n\t\t\t\tfloat: left;\n\t\t\t\tmargin-top: 10px;\n\t\t\t\ttext-align: center;\n\t\t\t\twidth: 25%;\n\t\t\t}\n\t\t\t#gallery-1 img {\n\t\t\t\tborder: 2px solid #cfcfcf;\n\t\t\t}\n\t\t\t#gallery-1 .gallery-caption {\n\t\t\t\tmargin-left: 0;\n\t\t\t}\n\t\t\t\/* see gallery_shortcode() in wp-includes\/media.php *\/\n\t\t<\/style>\n\t\t<div id='gallery-1' class='gallery galleryid-2602 gallery-columns-4 gallery-size-thumbnail'><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<a data-rel=\"iLightbox[postimages]\" data-title=\"\" data-caption=\"\" href='https:\/\/arntzbuilders.com\/wp-content\/uploads\/2015\/04\/dan_hardin_architect-0601.jpg'><img decoding=\"async\" width=\"150\" height=\"150\" src=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%272591%27%20height%3D%271727%27%20viewBox%3D%270%200%202591%201727%27%3E%3Crect%20width%3D%272591%27%20height%3D%271727%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" class=\"attachment-thumbnail size-thumbnail lazyload\" alt=\"\" data-orig-src=\"https:\/\/arntzbuilders.com\/wp-content\/uploads\/2015\/04\/dan_hardin_architect-0601-150x150.jpg\" \/><\/a>\n\t\t\t<\/dt><\/dl><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<a data-rel=\"iLightbox[postimages]\" data-title=\"\" data-caption=\"\" href='https:\/\/arntzbuilders.com\/wp-content\/uploads\/2015\/04\/dan_hardin_architect-131.jpg'><img decoding=\"async\" width=\"150\" height=\"150\" src=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%273621%27%20height%3D%271328%27%20viewBox%3D%270%200%203621%201328%27%3E%3Crect%20width%3D%273621%27%20height%3D%271328%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" class=\"attachment-thumbnail size-thumbnail lazyload\" alt=\"\" data-orig-src=\"https:\/\/arntzbuilders.com\/wp-content\/uploads\/2015\/04\/dan_hardin_architect-131-150x150.jpg\" \/><\/a>\n\t\t\t<\/dt><\/dl><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<a data-rel=\"iLightbox[postimages]\" data-title=\"\" data-caption=\"\" href='https:\/\/arntzbuilders.com\/wp-content\/uploads\/2015\/04\/dan_hardin_architect-114.jpg'><img decoding=\"async\" width=\"150\" height=\"150\" src=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%273197%27%20height%3D%271219%27%20viewBox%3D%270%200%203197%201219%27%3E%3Crect%20width%3D%273197%27%20height%3D%271219%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" class=\"attachment-thumbnail size-thumbnail lazyload\" alt=\"\" data-orig-src=\"https:\/\/arntzbuilders.com\/wp-content\/uploads\/2015\/04\/dan_hardin_architect-114-150x150.jpg\" \/><\/a>\n\t\t\t<\/dt><\/dl><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<a data-rel=\"iLightbox[postimages]\" data-title=\"\" data-caption=\"\" href='https:\/\/arntzbuilders.com\/wp-content\/uploads\/2015\/04\/dan_hardin_architect-208.jpg'><img decoding=\"async\" width=\"150\" height=\"150\" src=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%273764%27%20height%3D%271993%27%20viewBox%3D%270%200%203764%201993%27%3E%3Crect%20width%3D%273764%27%20height%3D%271993%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" class=\"attachment-thumbnail size-thumbnail lazyload\" alt=\"\" data-orig-src=\"https:\/\/arntzbuilders.com\/wp-content\/uploads\/2015\/04\/dan_hardin_architect-208-150x150.jpg\" \/><\/a>\n\t\t\t<\/dt><\/dl><br style=\"clear: both\" \/><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<a data-rel=\"iLightbox[postimages]\" data-title=\"\" data-caption=\"\" href='https:\/\/arntzbuilders.com\/wp-content\/uploads\/2015\/04\/dan_hardin_architect-709.jpg'><img decoding=\"async\" width=\"150\" height=\"150\" src=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%273110%27%20height%3D%271287%27%20viewBox%3D%270%200%203110%201287%27%3E%3Crect%20width%3D%273110%27%20height%3D%271287%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" class=\"attachment-thumbnail size-thumbnail lazyload\" alt=\"\" data-orig-src=\"https:\/\/arntzbuilders.com\/wp-content\/uploads\/2015\/04\/dan_hardin_architect-709-150x150.jpg\" \/><\/a>\n\t\t\t<\/dt><\/dl><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<a data-rel=\"iLightbox[postimages]\" data-title=\"\" data-caption=\"\" href='https:\/\/arntzbuilders.com\/wp-content\/uploads\/2015\/04\/dan_hardin_architect-7371.jpg'><img decoding=\"async\" width=\"150\" height=\"150\" src=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%273672%27%20height%3D%271462%27%20viewBox%3D%270%200%203672%201462%27%3E%3Crect%20width%3D%273672%27%20height%3D%271462%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" class=\"attachment-thumbnail size-thumbnail lazyload\" alt=\"\" data-orig-src=\"https:\/\/arntzbuilders.com\/wp-content\/uploads\/2015\/04\/dan_hardin_architect-7371-150x150.jpg\" \/><\/a>\n\t\t\t<\/dt><\/dl><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<a data-rel=\"iLightbox[postimages]\" data-title=\"\" data-caption=\"\" href='https:\/\/arntzbuilders.com\/wp-content\/uploads\/2015\/04\/dan_hardin_architect-0031.jpg'><img decoding=\"async\" width=\"150\" height=\"150\" src=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%272592%27%20height%3D%271150%27%20viewBox%3D%270%200%202592%201150%27%3E%3Crect%20width%3D%272592%27%20height%3D%271150%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" class=\"attachment-thumbnail size-thumbnail lazyload\" alt=\"\" data-orig-src=\"https:\/\/arntzbuilders.com\/wp-content\/uploads\/2015\/04\/dan_hardin_architect-0031-150x150.jpg\" \/><\/a>\n\t\t\t<\/dt><\/dl><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon portrait'>\n\t\t\t\t<a data-rel=\"iLightbox[postimages]\" data-title=\"\" data-caption=\"\" href='https:\/\/arntzbuilders.com\/wp-content\/uploads\/2015\/04\/dan_hardin_architect-7471.jpg'><img decoding=\"async\" width=\"150\" height=\"150\" src=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%271727%27%20height%3D%272591%27%20viewBox%3D%270%200%201727%202591%27%3E%3Crect%20width%3D%271727%27%20height%3D%272591%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" class=\"attachment-thumbnail size-thumbnail lazyload\" alt=\"\" data-orig-src=\"https:\/\/arntzbuilders.com\/wp-content\/uploads\/2015\/04\/dan_hardin_architect-7471-150x150.jpg\" \/><\/a>\n\t\t\t<\/dt><\/dl><br style=\"clear: both\" \/>\n\t\t<\/div>\n\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The project included the modernization of +\/- 4,500 sf of existing classroom space, construction of over 9,000 sf of new classroom space and administration offices in three separate buildings and an interconnecting covered walkway.  All new buildings were single story, slab on grade, wood framed construction. <\/p>\n","protected":false},"author":8,"featured_media":2604,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[13,9],"tags":[],"class_list":["post-2602","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-lease-leaseback","category-schools-k-12"],"_links":{"self":[{"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=\/wp\/v2\/posts\/2602","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2602"}],"version-history":[{"count":10,"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=\/wp\/v2\/posts\/2602\/revisions"}],"predecessor-version":[{"id":3120,"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=\/wp\/v2\/posts\/2602\/revisions\/3120"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=\/wp\/v2\/media\/2604"}],"wp:attachment":[{"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2602"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2602"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2602"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}