{"id":3056,"date":"2016-04-18T18:59:13","date_gmt":"2016-04-18T18:59:13","guid":{"rendered":"https:\/\/arntzbuilders.com\/?p=3056"},"modified":"2023-07-07T00:11:39","modified_gmt":"2023-07-07T00:11:39","slug":"robert-louis-steven-elementary-school","status":"publish","type":"post","link":"https:\/\/arntzbuilders.com\/?p=3056","title":{"rendered":"Robert Louis Stevenson Elementary School"},"content":{"rendered":"<h2><\/h2>\n<h2><a href=\"https:\/\/arntzbuilders.com\/wp-content\/uploads\/2016\/04\/100_2713w.jpg\"><img decoding=\"async\" class=\"lazyload aligncenter wp-image-3116\" src=\"https:\/\/arntzbuilders.com\/wp-content\/uploads\/2016\/04\/100_2713w.jpg\" data-orig-src=\"https:\/\/arntzbuilders.com\/wp-content\/uploads\/2016\/04\/100_2713w.jpg\" alt=\"KODAK Digital Still Camera\" width=\"555\" height=\"414\" srcset=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%27555%27%20height%3D%27414%27%20viewBox%3D%270%200%20555%20414%27%3E%3Crect%20width%3D%27555%27%20height%3D%27414%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" data-srcset=\"https:\/\/arntzbuilders.com\/wp-content\/uploads\/2016\/04\/100_2713w-300x225.jpg 300w, https:\/\/arntzbuilders.com\/wp-content\/uploads\/2016\/04\/100_2713w.jpg 456w\" data-sizes=\"auto\" data-orig-sizes=\"(max-width: 555px) 100vw, 555px\" \/><\/a><\/h2>\n<h2><\/h2>\n<h2>Jobsite Address:<\/h2>\n<p>2051 34th Avenue, San Francisco, CA 94116<\/p>\n<h2>Client:<\/h2>\n<p>San Francisco Unified School District<\/p>\n<h2>Architect:<\/h2>\n<p>Cody Anderson Wasney Architects<\/p>\n<h2>Contract:<\/h2>\n<p>$17.7 Million<\/p>\n<h2>Scope:<\/h2>\n<p>General School Modernization and renovation included <strong>ADA <\/strong>access and fire <strong>\/ <\/strong>life safety upgrades and voluntary structural upgrades to the existing building as well as replacement of doors and frames, including hardware and threshold conditions, upgrades to all building utility systems and infrastructure, renovation of all interior spaces including replacement of all window and glazing systems throughout including finish carpentry and trim, interior finishes and interior and exterior painting, replacement of all roofing and gutters <strong>\/ <\/strong>drains, as well as signage.\u00a0 Construction of a new 5-classroom building and associated support spaces and infrastructure including attached and freestanding walkway canopies, paving, and utility systems. Site work in all areas including strengthening of existing site retaining walls, play yard surfacing and striping and paving, fencing and gates, as well as signage.<\/p>\n<h2>Project Completion:<\/h2>\n<p>September 2017<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Jobsite Address: 2051 34th Avenue, San Francisco, CA 94116 Client: San Francisco Unified School District Architect: Cody Anderson Wasney Architects Contract: $17.7 Million Scope: General School Modernization and renovation included ADA access and fire \/ life safety upgrades and voluntary structural upgrades to the existing building as well as replacement of doors and frames, including hardware and threshold conditions, upgrades to all building utility systems and infrastructure, renovation of all interior spaces including replacement of all window and glazing systems [&#8230;]<\/p>\n","protected":false},"author":8,"featured_media":3116,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[9],"tags":[],"class_list":["post-3056","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-schools-k-12"],"_links":{"self":[{"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=\/wp\/v2\/posts\/3056","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=3056"}],"version-history":[{"count":14,"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=\/wp\/v2\/posts\/3056\/revisions"}],"predecessor-version":[{"id":4419,"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=\/wp\/v2\/posts\/3056\/revisions\/4419"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=\/wp\/v2\/media\/3116"}],"wp:attachment":[{"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=3056"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=3056"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=3056"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}