{"id":3662,"date":"2019-02-22T19:44:56","date_gmt":"2019-02-22T19:44:56","guid":{"rendered":"https:\/\/arntzbuilders.com\/?p=3662"},"modified":"2023-07-06T23:59:54","modified_gmt":"2023-07-06T23:59:54","slug":"marin-county-civic-center-roof-replacement","status":"publish","type":"post","link":"https:\/\/arntzbuilders.com\/?p=3662","title":{"rendered":"Marin County Civic Center Roof Replacement"},"content":{"rendered":"\r\n<figure class=\"wp-block-image size-full is-resized\"><a href=\"https:\/\/arntzbuilders.com\/wp-content\/uploads\/2019\/02\/Marin-Civic-Center.jpg\"><img decoding=\"async\" class=\"lazyload alignnone wp-image-4010\" src=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%27365%27%20height%3D%27206%27%20viewBox%3D%270%200%20365%20206%27%3E%3Crect%20width%3D%27365%27%20height%3D%27206%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" data-orig-src=\"https:\/\/arntzbuilders.com\/wp-content\/uploads\/2019\/02\/Marin-Civic-Center.jpg\" alt=\"\" width=\"365\" height=\"206\" \/><\/a><\/figure>\r\n\r\n\r\n\r\n<h2 class=\"wp-block-heading\" id=\"jobsite-address\">Jobsite Address:<\/h2>\r\n\r\n\r\n\r\n<p>3501 Civic Center Drive, San Rafael, CA 94903<\/p>\r\n\r\n\r\n\r\n<h2 class=\"wp-block-heading\" id=\"client\">Client:<\/h2>\r\n\r\n\r\n\r\n<p>County of Marin<\/p>\r\n\r\n\r\n\r\n<h2 class=\"wp-block-heading\" id=\"contract\">Contract:<\/h2>\r\n\r\n\r\n\r\n<p>$16.7 Million<\/p>\r\n\r\n\r\n\r\n<h2 class=\"wp-block-heading\" id=\"scope\">Scope:<\/h2>\r\n\r\n\r\n\r\n<p>Project scope involved the removal of all existing roof coating(s) down to the original substrate of the entire Civic Center and installation of a new Sikalastic Roof Pro fluid applied polyurethane membrane roofing system.<\/p>\r\n\r\n\r\n\r\n<h2 class=\"wp-block-heading\" id=\"project-completion\">Project Completion:<\/h2>\r\n\r\n\r\n\r\n<p>February 2020<\/p>\r\n","protected":false},"excerpt":{"rendered":"<p>Jobsite Address: 3501 Civic Center Drive, San Rafael, CA 94903 Client: County of Marin Contract: $16.7 Million Scope: Project scope involved the removal of all existing roof coating(s) down to the original substrate of the entire Civic Center and installation of a new Sikalastic Roof Pro fluid applied polyurethane membrane roofing system. Project Completion: February 2020<\/p>\n","protected":false},"author":8,"featured_media":4010,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[14],"tags":[],"class_list":["post-3662","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-historical"],"_links":{"self":[{"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=\/wp\/v2\/posts\/3662","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=3662"}],"version-history":[{"count":5,"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=\/wp\/v2\/posts\/3662\/revisions"}],"predecessor-version":[{"id":4402,"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=\/wp\/v2\/posts\/3662\/revisions\/4402"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=\/wp\/v2\/media\/4010"}],"wp:attachment":[{"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=3662"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=3662"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=3662"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}