{"id":4048,"date":"2022-02-03T19:55:15","date_gmt":"2022-02-03T19:55:15","guid":{"rendered":"https:\/\/arntzbuilders.com\/?p=4048"},"modified":"2023-07-06T23:57:14","modified_gmt":"2023-07-06T23:57:14","slug":"santa-rosa-roof-replacement-at-sam-jones-hall-water-pump-station-4-and-13-design-build","status":"publish","type":"post","link":"https:\/\/arntzbuilders.com\/?p=4048","title":{"rendered":"Santa Rosa Roof Replacement at Sam Jones Hall, Water Pump Station 4 and 13 &#8211; Design Build"},"content":{"rendered":"\r\n<figure class=\"wp-block-image size-full\"><a href=\"https:\/\/arntzbuilders.com\/wp-content\/uploads\/2022\/02\/Santa-Rosa-DB.jpg\"><img decoding=\"async\" class=\"lazyload alignnone wp-image-4049\" src=\"https:\/\/arntzbuilders.com\/wp-content\/uploads\/2022\/02\/Santa-Rosa-DB.jpg\" data-orig-src=\"https:\/\/arntzbuilders.com\/wp-content\/uploads\/2022\/02\/Santa-Rosa-DB.jpg\" alt=\"\" width=\"412\" height=\"168\" srcset=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%27412%27%20height%3D%27168%27%20viewBox%3D%270%200%20412%20168%27%3E%3Crect%20width%3D%27412%27%20height%3D%27168%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" data-srcset=\"https:\/\/arntzbuilders.com\/wp-content\/uploads\/2022\/02\/Santa-Rosa-DB-300x122.jpg 300w, https:\/\/arntzbuilders.com\/wp-content\/uploads\/2022\/02\/Santa-Rosa-DB.jpg 412w\" data-sizes=\"auto\" data-orig-sizes=\"(max-width: 412px) 100vw, 412px\" \/><\/a><\/figure>\r\n\r\n\r\n\r\n<h2 class=\"wp-block-heading\" id=\"jobsite-address\">Jobsite Address:<\/h2>\r\n\r\n\r\n\r\n<p>4020 Finley Ave., Santa Rosa, CA<\/p>\r\n\r\n\r\n\r\n<p>2260 Sonoma Ave., Santa Rosa, CA<\/p>\r\n\r\n\r\n\r\n<p>801 White Oak Drive, Santa Rosa, CA<\/p>\r\n\r\n\r\n\r\n<h2 class=\"wp-block-heading\" id=\"client\">Client:<\/h2>\r\n\r\n\r\n\r\n<p>City of Santa Rosa<\/p>\r\n\r\n\r\n\r\n<h2 class=\"wp-block-heading\" id=\"contract\">Contract:<\/h2>\r\n\r\n\r\n\r\n<p>$1.6 Million<\/p>\r\n\r\n\r\n\r\n<h2 class=\"wp-block-heading\" id=\"scope\">Scope:<\/h2>\r\n\r\n\r\n\r\n<p>Water Pump Station 4: Removed and disposed of existing roof material.\u00a0 Included testing of any materials suspected of containing hazardous substances.\u00a0 Repaired roof deck where water damage has occurred.\u00a0 Roof replacement to include all new gutters and downspouts tied into existing drain system where applicable. Water Pump Station 13: Removal, off haul, and disposal of existing roof and gutter system.\u00a0 Including asbestos testing of any suspected asbestos containing materials.\u00a0 Repaired roof deck where water damage had occurred.\u00a0 Replacement of roof with industry standard design and materials to meet wildfire prone location (Class A).\u00a0 Install a drip edge over both doorways.\u00a0 Sam Jones Hall: Removal, off haul, and disposal of existing roof and not used existing mechanical curbs, screen, etc.\u00a0 Including abatement of asbestos containing materials that were disturbed during the roof replacement.\u00a0 Including testing of any materials other than asbestos suspected of containing hazardous substances.\u00a0 Evaluated and repaired roof deck, downspouts, parapet walls where water damage had occurred.\u00a0 Removed and reinstalled required mechanical screens.\u00a0 Replacement of roof with industry standard design and materials.<\/p>\r\n\r\n\r\n\r\n<h2 class=\"wp-block-heading\" id=\"project-completion\">Project Completion:<\/h2>\r\n\r\n\r\n\r\n<p>March 2020<\/p>\r\n","protected":false},"excerpt":{"rendered":"<p>Jobsite Address: 4020 Finley Ave., Santa Rosa, CA 2260 Sonoma Ave., Santa Rosa, CA 801 White Oak Drive, Santa Rosa, CA Client: City of Santa Rosa Contract: $1.6 Million Scope: Water Pump Station 4: Removed and disposed of existing roof material.\u00a0 Included testing of any materials suspected of containing hazardous substances.\u00a0 Repaired roof deck where water damage has occurred.\u00a0 Roof replacement to include all new gutters and downspouts tied into existing drain system where applicable. Water Pump Station 13: Removal, [&#8230;]<\/p>\n","protected":false},"author":8,"featured_media":4049,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[8],"tags":[],"class_list":["post-4048","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industrial-commercial"],"_links":{"self":[{"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=\/wp\/v2\/posts\/4048","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=4048"}],"version-history":[{"count":2,"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=\/wp\/v2\/posts\/4048\/revisions"}],"predecessor-version":[{"id":4398,"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=\/wp\/v2\/posts\/4048\/revisions\/4398"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=\/wp\/v2\/media\/4049"}],"wp:attachment":[{"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=4048"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=4048"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=4048"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}