{"id":4257,"date":"2023-04-25T17:50:11","date_gmt":"2023-04-25T17:50:11","guid":{"rendered":"https:\/\/arntzbuilders.com\/?p=4257"},"modified":"2023-04-25T17:50:12","modified_gmt":"2023-04-25T17:50:12","slug":"roosevelt-middle-school-increment-1","status":"publish","type":"post","link":"https:\/\/arntzbuilders.com\/?p=4257","title":{"rendered":"Roosevelt Middle School Increment # 1"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">Jobsite Address:<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">1926 E 19th Street, Oakland, CA 94606<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Client: <\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Oakland Unified School District<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Contract:<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">$1.9 Million<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Scope:<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The scope of work for this project is site preparation for a new modular science classroom building with restroom facilities, additionally the project includes access compliance, including but not limited to: accessible path of travel to the area of work, site work and conduit for future utilities.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Anticipated Completion Date:<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">July 2023<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Jobsite Address: 1926 E 19th Street, Oakland, CA 94606 Client: Oakland Unified School District Contract: $1.9 Million Scope: The scope of work for this project is site preparation for a new modular science classroom building with restroom facilities, additionally the project includes access compliance, including but not limited to: accessible path of travel to the area of work, site work and conduit for future utilities. Anticipated Completion Date: July 2023<\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[11,9],"tags":[],"class_list":["post-4257","post","type-post","status-publish","format-standard","hentry","category-current-projects","category-schools-k-12"],"_links":{"self":[{"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=\/wp\/v2\/posts\/4257","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=4257"}],"version-history":[{"count":1,"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=\/wp\/v2\/posts\/4257\/revisions"}],"predecessor-version":[{"id":4258,"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=\/wp\/v2\/posts\/4257\/revisions\/4258"}],"wp:attachment":[{"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=4257"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=4257"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/arntzbuilders.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=4257"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}