Lowell Middle School Modernization Lease-Leaseback (J/V)
Jobsite Address: 991 14th St., Oakland, CA 94612 Client: Oakland Unified School [...]
gd-system-plugin
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114Jobsite Address: 991 14th St., Oakland, CA 94612 Client: Oakland Unified School [...]
Jobsite Address: 555 Middlefield Road, Atherton, CA 94027 Client: Sequoia Union [...]
Jobsite Address: 8695 Windsor Road, Windsor CA 95492 [...]
Over three summers we built sixty three (63) single classroom units at fourteen school sites for the Mt. Diablo Unified School District.
Construction of a new elementary school located in Fairfield, California. The work included 5 separate buildings, approximately 51,000 SF.
Over three summers we built sixty three (63) single classroom units at fourteen school sites for the Mt. Diablo Unified School District. The work at these sites also included modernization including painting, new roofs and campus wide fire alarm and communication systems.
The work at Tamalpais High School included modernization of existing historic structures and the addition of a new structural steel and wood framed, multi-storied theater arts building.
Over three summers we built sixty three (63) single classroom units at fourteen school sites for the Mt. Diablo Unified School District.
Over three summers we built sixty three (63) single classroom units at fourteen school sites for the Mt. Diablo Unified School District.
The work at Tamalpais High School included modernization of existing historic structures and the addition of a new structural steel and wood framed, multi-storied theater arts building.
The work at Tamalpais High School included modernization of existing historic structures and the addition of a new structural steel and wood framed, multi-storied theater arts building.
Construction of two new poured in place concrete and steel framed buildings approximately 86,000 SF. One building is two-story and includes the administration, library, student union, dining commons, and counseling center.
Construction of a new Middle/High school located in Hercules, California. The work included 18 wood framed buildings approximately 167,000 SF: Two gym buildings with locker rooms, bleachers and wood gym floors, two multi-purpose buildings with full kitchens, one two-story administration and library building.