Jobsite Address:

850 2nd Street, Brentwood, CA 94513

Client:

Liberty Union High School District

Contract:

$18.4 Million

Scope:

Demolition of three existing single-story buildings and construction of two new classroom buildings.  Building A is a two-story steel framed building with 14 general education classrooms at 960-sf each; 2 Special Day classrooms at 1,045-sf each, each with a restroom and sensory room; shared staff prep room and restroom; elevator and machine room; and utility rooms.  Building B is a single-story wood framed building with 1 science labs at 1,656-sf; 2 multi-stall student restrooms; and maintenance/custodial accessory spaces.  The two building will form a new learning and gathering courtyard and have 2 gated entry points.

Anticipated Completion Date:

April 2024