Jobsite Address:
350 Bell Lane, Mill Valley, CA 94941
Client:
Mill Valley School District
Contract:
4.1 Million
Scope:
Work consisted of demo of existing roofing system for installation of new singly ply roofing including wood nailers, curbs, skylights, electrical and mechanical runs and equipment. All exterior windows where abated and removed for installation of new clearstory and storefront glazing including wood framing, plaster, flashing and trim. The interior of the building was retrofitted with new Fire Alarm, wall mounted projectors, wire feeds, ceiling tile, wall fabric, flooring and paint. Work also included installation of new PG&E transfer of existing switch gear to new relocated switch gear and transformer after construction of concrete retaining wall and pad. On the opposite side of the site we over-excavated, imported, graded, form and placed new curb, gutter and entry for completion of new asphalt parking lot. The existing asphalt playground was reorganized with additional play equipment, striping and ADA picnic areas. The exterior of the existing and new work was completely repainted after installation of all new doors, frames, hardware and glazing.
Project Completion:
January 2021