Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the gd-system-plugin domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114
Arntz Arntz – Page 3 – Arntz Builders, Inc.

Admin

About Arntz Arntz

This author has not yet filled in any details.
So far Arntz Arntz has created 107 blog entries.

Lowell High School New Classroom Buildings

By |2022-02-03T22:05:06+00:00May 4th, 2015|Schools K-12|

Replace the existing portable classrooms on the Lowell campus with a permanent classroom complex consisting of a 12-classroom building and a 2-classroom building. In addition, the project requires associated sitework to reconfigure the existing parking lot and landscaping including exterior lighting, improve circulation, upgrade underground utilities and ADA access.

Peralta Oaks Seismic & Tenant Improvements

By |2022-02-03T21:41:21+00:00February 14th, 2015|Green Building, Industrial & Commercial|

Scope of work included seismic and tenant improvement of approx. 50,000 sf, three story concrete framed structure with post tensioned concrete slab decks. Extensive seismic improvements including rock anchors combined with collector beams, structural steel columns/beams and BRBs. Tenants include Alameda County Sheriff’s Office Crime Lab, Alameda County Public Health Lab, and Alameda County Sheriff’s Coroner’s Bureau.

Richmond Swim Center at Kennedy High School

By |2022-02-03T22:03:15+00:00February 14th, 2015|Community Centers & Parks, Schools K-12|

Complete removal of the degraded wood roof assembly over the natatorium and hazardous material abatement associated with demolition work. Upgrades to the natatorium includes additions of a new roof diaphragm assembly consisting of steel cross bracing and metal decking and addition of an operable skylight assembly with glass gable walls.

Korematsu Middle School

By |2022-02-03T22:07:05+00:00February 13th, 2015|Schools K-12|

Demolition of the existing buildings except for one large wood framed building. Major seismic renovations to this existing building including the addition of new footings to the basement. Three new cast in place concrete and structural steel buildings after roughly 30,000 cubic yards of export to terrace the site. New underground utilities, beautiful hardscape and even green roofs will make this school a great addition to the community.