Jobsite Address:
1035 West Texas Street, Fairfield, CA 94533
Client:
City of Fairfield
Contract:
$1.5 Million
Scope:
1) Removal of existing surfaced built-up roofing system, rigid insulation, reglets, counter-flashings, flashings, roof drains, partial gutters, and removal and salvage of existing smoke vents, removal of existing roof ducts, removal of existing ladder. Replace existing roof mounted gas pipe with new gas pipe of the same size and location after new roofing is in place. 2) Infill deck openings.
3) Power-wash existing CMU walls. 4) Installation of new roofing system, rigid insulation, minor electrical work, flashings, copings, roof drains, overflow drains and new conduits, support blocks and straps, new mechanical ducts, reinstallation of smoke vents, and installation of new gutter, new pipe jacks, new roof ladders with cage, bird netting with Unistrut support, new pre manufactured Unistrut stairs. 5) Clean out and test roof drains and overflows to verify clear flow. 6) Replacement of existing lights to LED light fixtures. Building will be occupied during construction. Provide cooling during the construction for the stage, main house, lobby and restrooms by connecting existing HVAC units to interior ducts with temporary flexible ducts.
Project Completion:
July 2020