Contra Costa County Juvenile Hall Addition
Construction of a new Juvenile Hall Addition of approximately 120,000 SF, two-story structure with the following departments: First and second floor housing wings consisting of four pod areas.
gd-system-plugin
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114Construction of a new Juvenile Hall Addition of approximately 120,000 SF, two-story structure with the following departments: First and second floor housing wings consisting of four pod areas.
Renovation and preservation of historical building including demolition of approximately half of a five (5) story building, approximately 22,000 SF and a five (5) story poured in place concrete addition to the building of approximate 62,000 SF.
This project had many challenging aspects. It was a renovation of one of the State’s most historic buildings (located adjacent to the State Capitol Building), which required demolishing the core of the structure and installing six new metal deck and concrete floors and seismic strengthening of the existing structure to support them.
Seismic retrofit that included the installation of concrete shear walls inside the historical library building wall locations in center of the building behind ornate plaster walls.
New construction of a structural steel and concrete library/community center building. This project was a very unusual job in that the exterior of the building consisted of concrete tilt-up panels that were 20% out of plumb by design.
Construction of a new award winning multi purpose community center located in San Jose, California. The work included renovation of the existing building and 3 new ground up steel framed buildings, with metal studs, drywall, lath and plaster, masonry, metal roofing, acoustical and metal suspended ceilings, bamboo flooring, ornamental metals, ceramic tile, institutional kitchen, custom lighting, voice and data systems, paging systems, CATV systems, closed circuit TV systems, fire sprinklers, and HVAC systems.
We performed structural and site concrete for a multi-prime trade package method of construction. Work included stepped seating area in the bowl-shaded amphitheater and all stairs, retaining walls, and foundations throughout the facility.