Hercules Middle/High School
Location: Hercules, CA Owner: West Contra Costa Unified School District 1108 Bis [...]
gd-system-plugin
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114Location: Hercules, CA Owner: West Contra Costa Unified School District 1108 Bis [...]
Jobsite Address: 350 Bell Lane, Mill Valley, CA 94941 Client: Mill Valley School [...]
Jobsite Address: 991 14th St., Oakland, CA 94612 Client: Oakland Unified School [...]
Jobsite Address: 555 Middlefield Road, Atherton, CA 94027 Client: Sequoia Union [...]
This Historic 1928, 5 story Supreme Court and State library sits across form the State Capitol in downtown Sacramento. The project included repair to exterior granite, terra cotta blocks and replacement of the historic windows. The interior was upgraded on all the Mechanical, Electrical and Plumbing with a state of the art mist system for the fire sprinkler.
Jobsite Address: 8695 Windsor Road, Windsor CA 95492 [...]
Jobsite Address: 1011 Andersen Dr. San Rafael, CA 94901 [...]
Over three summers we built sixty three (63) single classroom units at fourteen school sites for the Mt. Diablo Unified School District.
Construction of a new elementary school located in Fairfield, California. The work included 5 separate buildings, approximately 51,000 SF.
Over three summers we built sixty three (63) single classroom units at fourteen school sites for the Mt. Diablo Unified School District. The work at these sites also included modernization including painting, new roofs and campus wide fire alarm and communication systems.
The work at Tamalpais High School included modernization of existing historic structures and the addition of a new structural steel and wood framed, multi-storied theater arts building.
Over three summers we built sixty three (63) single classroom units at fourteen school sites for the Mt. Diablo Unified School District.
Over three summers we built sixty three (63) single classroom units at fourteen school sites for the Mt. Diablo Unified School District.
The work at Tamalpais High School included modernization of existing historic structures and the addition of a new structural steel and wood framed, multi-storied theater arts building.
The work at Tamalpais High School included modernization of existing historic structures and the addition of a new structural steel and wood framed, multi-storied theater arts building.
Construction of two new poured in place concrete and steel framed buildings approximately 86,000 SF. One building is two-story and includes the administration, library, student union, dining commons, and counseling center.
Construction of a new Middle/High school located in Hercules, California. The work included 18 wood framed buildings approximately 167,000 SF: Two gym buildings with locker rooms, bleachers and wood gym floors, two multi-purpose buildings with full kitchens, one two-story administration and library building.
Arntz projects with the Santa Clara Valley Transportation Authority consisted of two contracts at the Cerone complex: The Operating Maintenance Improvements for Articulated Buses and the Cerone Phase I Improvements.
Construction of a new laboratory building constructed of structural steel with metal siding finish approximately 8,700 SF.
This project involved constructing a one-story 220,000 square foot structural steel framed structure used as the main Base Exchange at Travis Air Force Base.
We built seven new buildings including library, classroom, gymnasium, science laboratory, mechanical building, book storage and covered walkway at an operational, occupied, community college campus.
Seismic retrofit that included the installation of concrete shear walls inside the historical library building wall locations in center of the building behind ornate plaster walls.
New construction of a uniquely shaded, wood framed, two-story college student center with exterior cement paneling.
We added two floors to the existing, occupied, five (5) story office and classroom building during the winter months. Approximately 32,000 SF of new construction and 150,000 SF of renovation work.
Three phases of work: New construction of a four-story building, Demolition of existing facility and New Construction of the north side of a concreate masonry.